SHIFT

--- Sjoerd Hooft's InFormation Technology ---

User Tools

Site Tools


powerbiinfrareport
Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
powerbiinfrareport [2019/03/06 08:37]
sjoerd [Realized Time by Category]
powerbiinfrareport [2019/03/06 08:39] (current)
sjoerd [Worksheet Work]
Line 44: Line 44:
 ** The year the work is planned for, and eventually started in. Don't change the startyear when the work is in progress. ​ ** The year the work is planned for, and eventually started in. Don't change the startyear when the work is in progress. ​
 * UnforSeenIn * UnforSeenIn
-** The year the work is taking place but is unforseen+** The year the work is taking place but is unforseen ​from a yearplan perspective (this assumes you have a clear work intake process so new work can be forseen)
 * Status (required) * Status (required)
 ** Run: For activitytype run ** Run: For activitytype run
powerbiinfrareport.txt ยท Last modified: 2019/03/06 08:39 by sjoerd